Skip to content
Automation Squad

By job

Automations for Sheet Metal Workers

Fabricate, assemble, install, and repair sheet metal products and equipment, such as ducts, control boxes, drainpipes, and furnace casings. Work may involve any of the following: setting up and operating fabricating machines to cut, bend, and straighten sheet metal; shaping metal over anvils, blocks, or forms using hammer; operating soldering and welding equipment to join sheet metal parts; or inspecting, assembling, and smoothing seams and joints of burred surfaces. Includes sheet metal duct installers who install prefabricated sheet metal ducts used for heating, air conditioning, or other purposes.

O*NET occupation: Sheet Metal Workers (47-2211.00). The software list and tasks below come from that record, not from guesswork.

Runs on software sheet metal workers already use

Matched through the tools this occupation is documented as using.

Software sheet metal workers use that we connect

What we can build for sheet metal workers

The job’s documented tasks, most important first. Each is a request away.

  1. Inspect individual parts, assemblies, or installations, using measuring instruments, such as calipers, scales, or micrometers.Quote it
  2. Maintain equipment, making repairs or modifications when necessary.Quote it
  3. Fabricate ducts for high efficiency heating, ventilating, and air conditioning (HVAC) systems to maximize efficiency of systems.Quote it
  4. Fasten seams or joints together with welds, bolts, cement, rivets, solder, caulks, metal drive clips, or bonds to assemble components into products or to repair sheet metal items.Quote it
  5. Transport prefabricated parts to construction sites for assembly and installation.Quote it
  6. Install assemblies, such as flashing, pipes, tubes, heating and air conditioning ducts, furnace casings, rain gutters, or downspouts in supportive frameworks.Quote it

Something specific to how you work?

Describe the apps and the outcome. A fixed quote and a delivery date come back within one business day, and the build is yours to keep.

Request a build for sheet metal workers